Factory Acceptance Test (FAT) Witnessing
With FAT witnessing, our inspectors attend factory and site acceptance tests on your behalf and confirm the results against the approved test procedure.
expertise
Overview
A factory acceptance test proves equipment works before it leaves the manufacturer, but only if someone independent is there to witness it.
We attend FATs and SATs for you, check the set‑up and results against the procedure, and sign a witness report.
Who is it for?
- EPC contractors and project owners
- Buyers of engineered equipment
- Consultants without local presence
- Utilities and industrial operators
What We Verify
Why It Matters
Proven performance
Equipment tested before shipment.
Save travel
Our inspectors attend for you.
Independent record
Signed results you can rely on.
Our Process
Request & scope
Send the purchase order, specification and location of the goods or work.
Plan
We assign a qualified inspector and agree the checklist and date.
Verification
Our inspector verifies on site, at the supplier or during the test.
Report
You receive a photo‑documented report with a clear conclusion.
Frequently Asked Questions
Yes. We review the procedure and ITP before the test and check that instruments are calibrated.
Yes. We witness site acceptance tests after installation.
Pumps, compressors, valves, pressure vessels, skids, panels, generators and other engineered equipment.