Factory Acceptance Test (FAT) Witnessing

With FAT witnessing, our inspectors attend factory and site acceptance tests on your behalf and confirm the results against the approved test procedure.

FATSATWitness reports
14+Years of
expertise
Verification

Overview

A factory acceptance test proves equipment works before it leaves the manufacturer, but only if someone independent is there to witness it.

We attend FATs and SATs for you, check the set‑up and results against the procedure, and sign a witness report.

Who is it for?

  • EPC contractors and project owners
  • Buyers of engineered equipment
  • Consultants without local presence
  • Utilities and industrial operators
Talk to an Expert
What’s Included

What We Verify

Review of test procedure and ITP
Calibration of test instruments
Pressure and leak tests
Performance and functional tests
Electrical and control system tests
Dimensional and visual checks
Punch list recording
Site acceptance test (SAT) witnessing
Signed witness report
How It Works

Our Process

1

Request & scope

Send the purchase order, specification and location of the goods or work.

2

Plan

We assign a qualified inspector and agree the checklist and date.

3

Verification

Our inspector verifies on site, at the supplier or during the test.

4

Report

You receive a photo‑documented report with a clear conclusion.

FAQ

Frequently Asked Questions

Yes. We review the procedure and ITP before the test and check that instruments are calibrated.

Yes. We witness site acceptance tests after installation.

Pumps, compressors, valves, pressure vessels, skids, panels, generators and other engineered equipment.